• 1
TRUST Header Install

New gasket after prepping with acetone.

Needed to modify the power-steering pump bracket to fit above the new header.

TRUST Header installed.



  • 1
TRUST Header Preparation

Ordered the TRUST header 5/6MGE 10510550 and combiner 11010001 from FortyOne Automotive in NZ. Took a while to manufacture and eventually arrive.

But this is what it looks like.

Unfortunately it got a bit scuffed during shipping. So i gave it a touch up coat of VHT flameproof blue.



  • 1
Under wraps



  • 1
What Remains to be Done?

List of remaining things required before the car can be registered:

Necessary

  • Reinstall cat converter.
  • Rebuild the dash.
  • Check brake lines and bleed.
  • Fix petrol tank lid.
  • Fix and install grille.
  • Attach front bumper.
  • Install front bumber indicators.
  • Get Front and Rear windscreens supplied and installed - need to find a reliable glazier who can supply and install NAGS code TT1506 PGI code TT9000. Size 1510 x 723.
  • Fix relay or fuse for parking headlights.
  • Install bonnet.
  • Retorque head bolts to 74 Ft/lb.
  • Install washer bottles.
  • Acquire and install boot rubber.
  • Complete filling the car with fluids.
  • Finish rebuilding interior trim.
  • Source new tyres.
  • Start car.

 

Optional

  • Acquire and fit a new stereo.
  • Rebuild passenger side door.
  • Install mud guards and under body plastic protection.
  • Fog lights.

 



  • 1
Windscreen Wiper Bar Prep



  • 1
Wiring Fusebox

Wired in the fusebox and ignitor today.



  • 1
Wiring - Removal

Finished the removal of the wiring loom this evening. There must be about 10Kg of wiring loom in total. I wonder if there is some way to simplify this?