All the wiring under the dash done.
The repaired crash pad.
Everything cleaned and installed on the crashpad
Everything installed.
For future reference. All th nuts and bolts that remain to be installed to hold it all in place.
Cleaned and ready.
Installed.
Heater core rebuilt with new seals..
Cleaning out the AC unit. So many leaves, and so much dust.
Rebuilt,
Main brake lines installed
Installed the ABS
All the fiddly parts at the bottom.
Old, not so bad looking fuel pump.
Old fuel pump removed.
New fuel pump installed
Tank rebuilt with all new gaskets
New parts, installed.
Trying to get a set of unbroken mirrors is difficult
All the mirror brackets seem to be broken in the same place.
Attempting to fix with superglue and putty.
Built a new flexible transmission cooler line.
Details (for 2 hoses):
3m of this AN6 hose
2m of 10mm Armourflex
2 x AN6 90 degree teflon hose ends
2 x AN6 male to M16x1.5
2 x AN6 male to Barb